Safety Cable Coiled Trailer Emergency Breakaway Cable Tool Safety Lanyard Big Carabiners

Availability: In stock

1.Diameter: 0.3-11mm,Custom-made available
2.Cable construction: 7*7,1*7,7*19,1*19
3Cable material: Galvanized or stainless steel
4.MOQ:1000pcs
5.includes: Spiral Cable,Carabiner,&Split-ring

Product Description

The coiled design keeps the cable up off the ground and out of harms way while you are towing. The zip cable easily attaches to the tow vehicle with a large spring clip and attaches to the existing pin. The universal design quickly and easily replaces almost any broken/damaged breakaway cable you have.

Perfect for those who want to upgrade their cable.

How to choose material:

1.Stainless steel :  Providing good corrosion resistance and strength comparable to galvanized carbon steel grades.

2.Galvanized steel:  Zinc coated carbon steel offers some corrosion resistance. It remains ductile over long periods of working. Usually higher break strengths than stainless steels. 

Diameter

Construction

Weight(100m)

  Minimum Breaking load(N)

1.0mm

  1*19

 0.495

     950(95kg)

 

    7*7

 0.393

     650 (65kg)

 1.2mm

    1*19

0.713

   1440(144kg)

 

    7*7

 0.566

    950(95kg)

 1.5mm

    1*19

 1.114

   2200(220kg)

 

    7*7

 0.884

   1500(150kg)

 1.8mm

    1*19

 1.604

   3200(320kg)

 

    7*7

 1.273

   2100(210kg)

 2.0mm

    1*19

 1.98

   3900(390kg)

 

    7*7

 1.527

   2650(265kg)

 2.4mm

    1*19

 2.851

   5650(565kg)

 

    7*7

 2.264

   3800(380)kg

2.5mm

    1*19

 3.094

   6100(610kg)

 

    7*7

 2.381

   4100(410kg)

 3.2mm

    7*7

 4.024

   6850(685kg)

 

   7*19

 3.901

   6800(680kg)

3.8mm

   7*19

 5.675

   9650(965kg)

 

    7*7

 5.502

   9600(960kg)

4.0mm

   7*19

6.609

  12500(1250kg)

4.2mm

   7*7

6.933

  13000(1300kg)

4.5mm

   7*7

7.958

  13500(1350kg)

4.8mm

   7*19

8.778

  15300(1530kg)

6.0mm

   7*19

8.716

  23900(2390kg)

Package,Delivery and Payment Terms.

Package: Carton or wooden pallet.

Shipment port: Ningbo,China.

Delivery terms: About 30 days after receiving the advance.

Payment terms: 30% prepaid,70% balance payment againest fax copies of shipping docs,then seller release the original shipping doc to buyer.

Product Tags

Add your tags

Use spaces to separate tags. Use single quotes (') for phrases.